Providing and applying 12mm thick finish cement plaster at all heights and below plinth in 1:4 cement mortar to the walls, beams, ceiling, stair, column, pattias, grooves including scaffolding, curing finishing smooth. The plaster surface shall be rubbed with 'Iron plate". till the surfae shows cement paste in line and level complete as directed.
الحصول على السعرAug 25, 2017· Description: The main object of this project is to study and prepare Bill of Quantities (BOQ), Bar Bending Schedule (BBS), and Material Requirement Statement for materials like Cement, Sand, Coarse Aggregates (12mm, 20mm, 40mm), and Steel Reinforcement of different bars of diameter of 8mm, 10mm, 12mm, 16mm, 20mm, 25mm, and 32mm.
الحصول على السعرBOQ Civil Works Sr. Description. Qty Unit. In Figures In Words Amount ( Rs.) Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. in width as well as 10 sqm on plan) including disposal of excavated earth, in all leads inside the project
الحصول على السعرProviding laying in position reinforced cement concrete work 1::3 (1 cement : sand : 3 graded crushed rock 20 mm nominal size) in Tse chu khanim at all floor levels incl. f/work, finish with 6mm thk plaster on exp. surface with CM 1:3, excl. reinf. decorative painting cost as per std. dgn.(Meas. to be along the cornicewall junction).
الحصول على السعرCIVIL WORK 1 Demolition Dismantling a Demolition of existing wall inclusive of removal of lintels, slabs, cleaning etc, and disposal of debris at indicated location off site. sqft c Laying of PCC (or brickbat coba)1:2:4 (1 Cement, 2 Sand 4 Stone aggregate) of thickness as required to achieve desired
الحصول على السعرThe National Department of Public Works. Director General The person appointed as Head of Department, of the Department of Public Works. Departmental Project Manager (see Section ) Consultant The Consultant is the Private Consulting Civil Engineer or Consulting Civil
الحصول على السعرPART8Misc. works(FOR CIVIL WORKS FOR 33/11 KVS/S) 1 Metal spreading LS 2 Construction of 11 KV VCB foundation with ... 18 Cement Concreting of Stay Pit 114 19 Cement Concreting of Pole Each 300 ... BOQ FOR EARTH WORK FOR BORING AT 300 MM DIA CABLE
الحصول على السعرJul 23, 2017· Following are the steps to calculate the quantity of steel for RCC slab 1. Prepare a bar bending schedule in order to classify different shapes of bars (bent up bar, straight anchor bar, eos bar, curtail bar etc) and diameters. 2. List down all the shapes .
الحصول على السعرPlastering Work Ratio Calculation. = 100 m 2 x = m 3 (This is wet volume that means we need this much volume of cement mortar after mixing water, So for dry volume, we have to add 3035% as bulkage of sand, we are using 35% and wastage as 20%) Consider 35% Sand Bulkage =...
الحصول على السعر7 Plaster the entire area of wall and ceiling both inside and outside with 1:3 rich cement mortar. 1 8 Finish the floor inside the rooms with 3" sand filling, 3" PCC and plastering. 1 9 Putty to be applied to the walls on the inside outside and the ceiling.
الحصول على السعر30 Jan 2013, Work on the monorail network in Delhi is expected to start in the next couple of, Civil construction of a Cement Grinding Unit at Anakapalli, Visakhapatnam, Andhra Pradesh for Madras Cement Ltd Civil construction of main.
الحصول على السعرProposed Room TDG016 at Ta' Dbiegi Gozo (Civil Works) ... Render in two coats of cement sand mortar (1:3 mix) internal ceiling to a smooth finish. Supply and apply one coat of stabilising solution and two coats of water paint (purosa) to ceiling. (Technical literature and specifications to be specifications to be
الحصول على السعرThe scaffolding floor to be made of wood planks and installed meters away from the lower edge of the structure. The floor under the bridge to be relocated as needed. The same scaffolding structure to be used, and costed only once, for all kind of works throughout the entire construction period.
الحصول على السعرRate : The payment per unit of work at which the Bidder bids to do work Amount : The quantity of an item multiplied by the bidder rate of the (same) item Sum : An amount bidded for an item, the extend of which is describe0d in the Bill . of Quantities, Specifications or elsewhere, but of which the quantity of . work is not measured in units . 16.
الحصول على السعرSpecification for Civil Works 2015 31. and along the construction and expansion joints at the interval of 300 mm to reach the soil below. Chemical emulsion shall be squirted into these holes using a hand operated pressure pump to soak the soil below until refusal or upto a maximum of one litre per hole.
الحصول على السعر